A full tidal array has not been installed anywhere, commercially to date. A number of the leading turbine manufacturers have part or full scale working prototypes which are under-going testing in various sites the majority of which are enclosed in semi-test environments. In order to move this nascent technology into the commercial arena and expedite market deployment, it is necessary to establish an array of turbines in one site to verify the performance capability and environmental characteristics of a full array.
TROPOS is a European collaborative project funded by the European Commission under the 7th Framework Programme for Research and Development, more specifically under the "Ocean of Tomorrow" call OCEAN 2011.1 – Multi-use offshore platforms. The TROPOS Project aims at developing a floating modular multi-use platform system for use in deep waters, with an initial geographic focus on the Mediterranean, Tropical and Sub-Tropical regions, but designed to be flexible enough so as to not be limited in geographic scope.
Scotland has substantial wave and tidal energy resources and is at the forefront of the development of marine renewable technologies and ocean energy exploitation. The next phase will see these wave and tidal devices deployed in arrays, with many sites being developed. Although developers have entered into agreements with The Crown Estate for seabed leases, all projects remain subject to licensing requirements under the Marine Scotland Act (2010).
TorqTidal seeks to provide control strategies for tidal current turbines that will reduce the risk of failure and increase the lifetime of device components without increasing capital costs. This will act to increase investor confidence and drive down the LCOE, which is a key step in helping the UK to exploit its significant tidal energy resource.
WindSurf aims to develop a core enabling technology - active blade pitching for a vertical axis wind turbine. This will allow wind turbines to operate in challenging wind conditions, to operate quietly and for new, lower maintenance turbine designs. WindSurf will open up new sites for wind energy: sites previously rejected because wind speeds were too low, variable or subject to swirling, or where noise nuisance would have been a concern. WindSurf will tackle all three parts of the energy trilemma: reducing emissions, increasing security of supply, and reducing cost.
Marine energy should make a substantial contribution to the UK renewable energy target of 30% electricity by 2020. Tidal stream turbines are a more mature technology than wave energy devices while the potential of wave energy is considerable. There is a growing capability and confidence in the loading and performance of marine energy devices in operating conditions as designs rapidly develop. However knowledge of extreme loading is less mature and indeed there is some uncertainty about their origin.